George Washington Bridge
Groupe Lefebvre and Venture Construction (American subsidiary), in conjunction with Bishop/Sanzari, have waterproofed the bottom level roadways of the bridge, as well as its access ramps on the New Jersey side.
A pre-rolled type 3 membrane was also mechanically applied on the bottom slab of the bridge, and a methyl methacrylate membrane was installed on the access ramps.
Specifications
- Owner : Port Authority of New York and New Jersey
- Project date : 1999 – 2000
- Cost : 1 000 000 $