Groupe Lefebvre is reputed for its wide variety of specialties.
Over the years, we have developed excellent relationships with our numerous partners, which allow us to complete major projects as a general contractor.
We are committed to our clients in offering them products and services of first-class quality, within the timelines and budgets agreed. To succeed, we work closely with all project’s stakeholders.
Accomplishments
-
Molson Stadium
In the Spring of 2010, University McGill and the Montreal Alouettes have enlarged the Molson Stadium. A new structure made of precast concrete allowed the addition of 5,000 seats and many private boxes.
-
George Washington Bridge
Groupe Lefebvre and Venture Construction (American subsidiary), in conjunction with Bishop/Sanzari, have waterproofed the bottom level roadways of the bridge, as well as its access ramps on the New Jersey side.
-
Beauharnois’ suspension bridge
Refection of the Beauharnois' suspension bridge on 132 road
-
Papineau-Leblanc Bridge
Repair of Papineau-Leblanc Bridge on highway 19, over the rivière des Prairies, that connects Montreal and Laval
-
Montreal Impact’s practice field
Damp-proofing of the concrete slab beneath the soccer or football practice field of the Régie des Installations Olympiques.
-
Green roof (LEED Gold project)
With a surface of over 30,000 square-feet, including an accessible 8,000 square-foot terrace, where Groupe Lefebvre built two ponds that, helped by plants, are tasked to filter the greywaters of the building.